The calculated Break Even Point is 10 Months
When using a case erector with Tape closure, total running costs of Tape per year will be: € 36.000
When using a case erector with Hotmelt closure, total running cost of Hotmelt per year will be: € 12.000
Here you go, these are your results!

Based on your choices in the Break Even Calculator, we calculated a 10 month payback period of the surcharge for a case erector with Hotmelt closure compared to Tape closure.
The higher the required case erecting capacity, in combination with the respective case length and width, the faster the additional cost of a hot melt case erector can be recovered.